Project information
Iberdrola´s CCGT power generation capacity to fulfil the requirements of the new O.P. 7.4
November 2025 - December 2025
Funding entity Iberdrola Generación Térmica S.L.
This work is aimed at determining Iberdrola's CCGT power generation capacity to fulfil the requirements of the new OP 7.4 on voltage control of the transmission grid.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
IberdrolaGeneracionCicloCombinadoPO7_4